Executive Summary Below is the basic concept of TorcSill’s approach to transformer containment and foundation support: During this project there were 2 Siemens (285k lbs
This project objective was theinstallation of battery storage containers on helical pile foundations within an electoral substations. After the original pier reinforcement design proved unfeasible due to failed concrete, TorcSill provided a foundation solution that bypassed the existing pier, utilizing steel frames connected to multiple helical piles.