Explore Our Case Studies.

Featured

Our latest work. 

All Case Studies

CRASH WALL
Industrial

Crash Wall

Designing and installing 100 piles to support highway integrity in the event of a train derailment along a new track addition. TorcSill worked closely with a major railroad owner and its Engineer of Record on an important public safety Project, successfully designing and installing more than 100 piles to support highway integrity in the event of a train derailment along a new track addition.

Read More »
coker unit foundation
Industrial

Coker Unit Foundation

Tight construction schedule, zero spoils generation and existing slab foundation remediation. The Coker Unit Foundation Project called into service many of the intrinsic attributes of helical piling foundation design and construction, including tight construction schedule, zero spoils generation and existing slab foundation remediation.

Read More »
TERMINAL DOCK METERING
Industrial

Terminal Dock Metering

Exhaus­tive engineering, load testing, custom helical pile manufacturing, installation tooling fabrication. TorcSill’s turnkey solution was the ideal fit for this Project, which required exhaus­tive engineering, load testing, custom helical pile manufacturing, installation tooling fabrication and one of the largest hydraulic drive motors in the business, all before construction crews were to safely install 30-inch, single-pile founda­tions.

Read More »
PCP DRYER FOUNDATION
Industrial

PVC Dryer Foundation

Engineered foundation design and installation solution for a PVC Dryer to reduce the construction footprint. TorcSill was approached by a petrochemical plant owner to provide a value engineered foundation design and installation solution for a PVC Dryer to reduce the construction footprint while delivering verifiable load-bearing capacities required for a plant expansion.

Read More »